Sale!

Lasco Reducing Bushing, 1 x 3/4″ Spigot x Slip White PVC Schedule 40 | 437-131

Original price was: $5.99.Current price is: $1.80.

SKU: 437131 Category: Tag:

Description

Lasco 437131 (437-131) Schedule 40 PVC Reducer Bushing – 1″ Spigot x 3/4″ Slip (Socket) – White

The Lasco 437131 (often shown as 437-131) is a Schedule 40 PVC reducer bushing that steps down from a 1″ hub/socket fitting to 3/4″ PVC pipe. The 1″ spigot end is designed to glue into the socket of a 1″ PVC fitting (tee, coupling, valve, etc.), while the 3/4″ slip (socket) end accepts 3/4″ PVC pipe for a solvent-weld connection.

Key Features

  • Part Number: 437131 (also listed as 437-131)
  • Fitting Type: Reducer bushing
  • Size: 1″ Spigot x 3/4″ Slip (Socket)
  • Material: Schedule 40 PVC
  • Color: White
  • Use: Reduces a 1″ socket connection down to a 3/4″ glued pipe run

Common Uses

  • Stepping down a manifold port without changing the larger hub fitting
  • Pool/spa equipment pad plumbing (auxiliary lines, bypasses, small returns)
  • Irrigation and general water plumbing where Sch 40 solvent-weld PVC is used

Installation Notes

  • Spigot end: Glues into a 1″ slip socket (hub) on another fitting (it does not glue onto 1″ pipe).
  • 3/4″ socket end: Glues to 3/4″ PVC pipe using primer and PVC cement.
  • Dry-fit first: Confirm alignment and insertion depth before cementing.
  • Support the line: Reduce pipe strain so the bushing isn’t carrying bending stress.

Related Products

  • Search: Lasco 437131
  • Search: Lasco 437-131
  • Search: 1″ Spigot x 3/4″ Slip Reducer Bushing
  • Search: 1″ Schedule 40 PVC Tees
  • Search: 3/4″ Schedule 40 PVC Pipe
  • Search: 3/4″ PVC Unions
  • Search: PVC Primer
  • Search: PVC Cement
  • Search: Lasco Schedule 40 PVC Fittings

Installation & Maintenance Tips

  • Deburr and chamfer pipe ends before gluing to help prevent wiping cement out of the joint during assembly.
  • Use the correct primer/cement and follow cure-time guidance before pressurizing (temperature and humidity affect cure time).
  • Keep sockets and pipe ends clean and dry for the strongest solvent-weld bond.
  • Use pipe supports to reduce vibration and stress near equipment pads and valves.
  • If you expect future equipment removal, add a union nearby to avoid cutting pipe later.